UNIVERSITY OF HOUSTON CLEAR LAKE

  • Provided professional guidance to determine the most economical solution to replacing roadways throughout the University

  • Repaired approximately 4,200 LF of existing asphalt roadway using an asphalt milling process

  • Replaced areas where existing base material had failed

  • Installed pavement markings to ensure proper traffic flow