uohcl - logo-usage-correct-usage_edited

University Of Houston Clear Lake

  • Provided professional guidance to determine the most economical solution to replacing roadways throughout the University
  • Repaired approximately 4,200 LF of existing asphalt roadway using an asphalt milling process
  • Replaced areas where existing base material had failed
  • Installed pavement markings to ensure proper traffic flow