UNIVERSITY OF HOUSTON CLEAR LAKE
-
Provided professional guidance to determine the most economical solution to replacing roadways throughout the University
-
Repaired approximately 4,200 LF of existing asphalt roadway using an asphalt milling process
-
Replaced areas where existing base material had failed
-
Installed pavement markings to ensure proper traffic flow